Skip to content

Ad Disclosure

College Football

LOOK: Faurot Field looks drastically different during ongoing south end zone construction

Adam Spencer

By Adam Spencer

Published:

The Missouri Tigers are doing a drastic renovation of Faurot Field this offseason, which includes a complete rebuild of the south end zone section.

During the Tigers’ spring game on Saturday afternoon, the stadium looked much different, as the entire south end zone structure was simply gone.

Below, you can see the empty lot that now stands opposite the Rock M in the stadium:

The construction project is going to take place throughout the 2018 season, but is expected to be completed ahead of the 2019 campaign.

For now, though, Faurot Field looks much different than it has for the last few decades.

Adam Spencer

Adam is a daily fantasy sports (DFS) and sports betting expert. A 2012 graduate of the University of Missouri, Adam now covers all 16 SEC football teams. He is the director of DFS, evergreen and newsletter content across all Saturday Football brands.

You might also like...

2025 RANKINGS

presented by rankings